| 6.0 |
DOCUMENT CONTROL |
| 6.1 |
All contacts/purchase
orders are assigned a job number. This number shall appear
on all correspondence and all other documents unique to
the particular job, and shall be maintained in the job/customer
file. |
| 6.2 |
The QAT will
in the normal course of the continuous improvement activities,
periodically review all methods and procedures in use by
their department and make necessary revisions as required. |
| 6.3 |
All control documents
(vendor purchase orders) generated by the FPCo will be
reviewed for accuracy and maintained in the job/customer
file. |
|
|
| 7.0 |
PURCHASING |
| 7.1 |
Vendors will
be selected based on their ability to conform to the quality
standards of the FPCo. |
| 7.2 |
Purchasing QAT
shall identify all key suppliers and communicate to these
suppliers the need for conformance to quality requirements.
These key suppliers are members of the FPCo's VMF. Their
long relationship and continued effort to supply only quality
materials is the only reason they continue to be a FPCo
vendor. In addition to being monitored by our Purchasing
QAT as stated, additional areas of performance required
are: on time delivery performance, conditions of packages
upon receipt, accuracy of packing lists and invoices, technical
assistance, quality of products, and competitive pricing,
etc. |
| 7.3 |
All purchase
orders shall contain the information necessary for the
vendor to provide the equipment and/or service required.
This shall include, when applicable: vendor part numbers,
descriptions, specifications, drawings, compliance to applicable
codes and standard packaging instructions inspection requirements,
and all other information deemed necessary to provide the
finished product. |
| 7.4 |
The Purchasing
Department will verify, through inspection of materials
received, as described by product purchase orders, the
conformance to quality requirements. Final verification
is completed through the final article function tests conducted
at the completion of the assembly. |
|
|
| 8.0 |
PROCESS CONTROL |
| 8.1 |
The design and
production of the types of products furnished by the FPCo
will comply with the customer's requirements limited only
by codes and FPCo standards. |
| 8.2 |
The following
codes and standards are used in part, or as applicable,
as a guide for the quality of production and workmanship
for the various products produced:
A)
National Fire Protection Association (NFPA)
B) American National
Standards Institute (ANSI)
C) American Welding
Society (AWS)
D) Underwriters Laboratories
Inc. (UL)
E) Steel Structure
Painting Council (SSPC)
F) National Equipment
Manufacturers Association (NEMA) |
| 8.3 |
All process control
is the responsibility of the respective vendor/manufacturer.
Documented procedures whatever the form is the prerogative
of the individual manufacturer. The fabrication and assembly
process quality is maintained based on the skill of the
individual craftsman and/or vendor and not on a procedure
written for a specific discipline. |
|
|
| 9.0 |
INSPECTION
AND TESTING |
| 9.1 |
All incoming
raw materials or finished products from suppliers are carefully
inspected for item description, quantity and damage. Only
those items, which meet the requirements of the customer
and the FPCo, are allowed for final product assembly. |
| 9.2 |
During the production
process, all assembly items are matched to the design requirements.
Deviations are approved by the project manager and documented.
As applicable, the customer is required to approve changes. |
| 9.3 |
Any product,
which does not meet the requirements, is removed from the
assembly process. Depending on the item, the option for
modification, repair or replacement is directed to the
project manager. |
| 9.4 |
Corrective actions
are documented and are discussed with production personnel
and management to minimize possible re-occurrence. |
| 9.5 |
All equipment
shall receive a final inspection and function test if applicable.
Function test criteria will be amended based on equipment
type and agreed upon customer requirements. |
| 9.6 |
Only customer
required inspection records and test certificates shall
be maintained in the job/customer file. |
|
|
| 10.0 |
INSPECTION, MEASURING AND TEST EQUIPMENT |
| 10.1 |
Test equipment
used by the FPCo's vendors in their production process
is calibrated as required depending on the equipment and
the code compliance. |
| 10.2 |
Calibration certificates
are provided only as specially required by the client request.
The calibration certificate for the latest calibration
will be provided as required by said request. |
|
|
| 11.0 |
INSPECTION AND TEST STATUS |
| 11.1 |
The primary components;
pump, gear, engine and controller are factory tested to
comply with Hydraulic Institute, AGMA, NFPA and individual
manufacturer's standards. In the event UL/FM labels (certification)
are required, identification methods consist of, but are
not limited to, metal stamps, tags, labels and inspection
test records. Tests are conducted as defined by the vendor
P.O.s as per the ITP attached. All specified inspection
and test records and/or certificates are maintained in
the job files for inclusion in the job data manuals. |
|
|
| 12.0 |
CONTROL OF NON-CONFORMING PRODUCTS |
| 12.1 |
Products identified
as not in compliance with specifications or FPCo vendor
P.O.s will immediately he removed from the assembly process. |
| 12.2 |
Standard products
found to be defective or not in conformance will be returned
to the vendor for replacement or repair. Additionally,
the Purchasing QAT shall note the discrepancy in the vendor
file. In the event the vendor cannot comply with the FPCo
requirements, an alternate vendor will be selected to meet
these requirements. |
| 12.3 |
Fabricated items
found to be defective or not in conformance will be replaced
or repaired under the direction of the project manager.
The cause for the variation shall be determined and if
necessary the drawings changed to eliminate future defects. |
| 12.4 |
It is the responsibility
of all THE FIRE PUMP CO. employees and members of the "VMF" to
assure that our customers receive the highest quality products
and services. All areas of non-conformance to requirements
will be addressed and resolved with the appropriate vendor.
The QAT and the QAM are empowered to develop action plans
to improve the process, and when appropriate, implement
their plans. |
|
|
| 13.0 |
HANDLING, STORAGE AND DELIVERY |
| 13.1 |
Customer requirements
for handling, storage and shipment will be noted in the
contract review. If the FPCo cannot comply with customer's
requirements the customer will be notified and alternative
methods of storage, handling and delivery will be approved
prior to order entry. |
| 13.2 |
Handling and
storage of all incoming raw materials and finished products
shall be consistent with manufacturer's recommendations
to prevent damage and/or deterioration. |
| 13.3 |
The Project Manager
or the Purchasing Department will communicate instructions
for special handling and storage requirements to the shop
personnel in writing. |
| 13.4 |
Special packaging
and shipping requirements will be communicated in writing
to shop and shipping personnel and documented in the job
file. When applicable, the instructions shall also be printed
on all shipping papers and documents. |
| 13.5 |
All hazardous
materials will be properly labeled, packaged, and shipped
in accordance with appropriate codes and standards. |
|
|
| 14.0 |
QUALITY RECORDS |
| 14.1 |
Records pertinent
to The FPCo quality management system and continuous improvement
process will be maintained by the (QAM). |
| 14.2 |
The Purchasing
Manager maintains necessary records from primary suppliers
on their quality management system and availability of
evidence of such a system. |
| 14.3 |
Quality assurance
inspection reports, test certificates and other quality
related data pertinent to a specific job or contract shall
be available from primary vendors only. |
|
|
| 15.0 |
TRAINING |
| 15.1 |
New FPCo employees
will be properly trained in the area that they will be
working before any is to be performed. The department manager
is responsible for documenting satisfactory completion
of the training. |
| 15.2 |
Department managers
will conduct regularly scheduled training sessions in an
effort to improve skills in all areas of our operation. |
| 15.3 |
It will be the
responsibility of management to stay current with any changes
to industry standards, State or Federal Laws, or manufacturer's
recommended procedures and train the appropriate personnel
which the changes would affect. |
| 15.4 |
Employee Personnel
files will be maintained to record any individual training
received. |
|
|
| 16.0 |
PURCHASE ORDER PROCEDURE |
| 16.1 |
All material
and services are issued a purchase order defining specifically
the item required. Each order is assigned a number that
is comprised of the job designation and the commodity code
number i.e. the pump is 01, the gear is 06, the engine
is 08 and the controller is 16. The commodity code is always
the same. |
| 16.2 |
The P.O. includes
the description of the commodity, services or tests and
the factory test certificates that are required and available.
i.e. pump performance or hydro, engine test letter, vessel
hydro et al. |
| 16.3 |
The P.O.s are
issued; the original to the vendor, copies with prices
to accounting and to the job file, copies without prices
to the assembly shop. Unpriced copies w/an ITP are issued
to the client when required. |
| 16.4 |
The assembly
shop copies are used to verify what each purchased item
is visually what was ordered and undamaged through shipment. |